GENERAL IMPLEMENTING RULES AND PROCEDURES
Only selected toll plazas will participate in the dry-run
For a smooth and efficient implementation, the dry-run shall be implemented in batches. In addition to the first, second, third, fourth, fifth, sixth, seventh, eight, and ninth batches, the tenth batch includes the following:
South Luzon Expressway:
- Silangan NB Entry and Exit
South Metro Manila Skyway Stages 1 & 2:
- Sucat SB Entry
Metro Manila Skyway Stage 3:
- Sgt. Rivera Exit
- Del Monte NB Bravo
- Del Monte SB Bravo
Non-participating toll plazas shall continue to collect tolls thru ETC (RFID) lanes and cash lanes.
On participating toll plazas, motorists with no RFID Stickers shall be directed to a safe place/location where he can pay the toll fees in cash, and shall be persuaded to have an RFID sticker installed.
Though cash payment of toll fees is still allowed, motorists are encouraged to switch to RFID for a faster and more convenient entry and exit at the toll plazas.