GENERAL IMPLEMENTING RULES AND PROCEDURES
Only selected toll plazas will participate in the dry-run.
For a smooth and efficient implementation, the dry-run shall be implemented in batches.
In addition to the first, second, and third batches, the fourth batch includes the following:
AUTOSWEEP SUBSCRIBERS
28 September 2023
South Luzon Expressway (SLEX)
- Filinvest Entry
- Sta. Rosa NB Entry and Exit
- Calamba NB Exit
Metro Manila Skyway Stage 3 (MMSS3)
- Quezon Avenue NB Exit
EASYTRIP SUBSCRIBERS
01 October 2023
North Luzon Expressway (NLEX)
- Tabang Entry and Exit
- Angeles Entry and Exit
Non-participating toll plazas shall continue to collect tolls thru ETC (RFID) lanes and cash lanes.
On participating toll plazas, motorists with no RFID stickers shall be directed to a safe place/location where he can pay the toll fees in cash, and shall be persuaded to have an RFID sticker installed.
Though cash payment of toll fees is still allowed, motorists are encouraged to switch to RFID for a faster and more convenient entry and exit at the toll plazas.