Project Description
The SLEX TR5 Alignment composes of eight (8) segments which will run parallel to the existing Philippine National Railway, Maharlika Highway and Padre Burgos National Road or Quirino Highway:
Segment | Location | Length (km) |
Segment 1 | Lucena to Gumaca, Quezon | 61.00 |
Segment 2 | Gumaca to Tagkawayan, Quezon | 58.60 |
Segment 3 | Tagkawayan to Sipocot, Camarines Sur | 61.40 |
Segment 4 | Sipocot to Naga City, Camarines Sur | 39.50 |
Segment 5 | Naga City to Polangui, Albay | 45.90 |
Segment 6 | Polangui to Legazpi City, Albay | 33.60 |
Segment 7 | Legazpi City to Sorsogon City, Sorsogon | 57.70 |
Segment 8 | Sorsogon City to Matnog, Sorsogon | 62.30 |
Total | 420.00 |
SLEX TR5, Segment 1 alignment starts at the termination point of the SLEX Phase II as the Toll Road 4 (TR4) Project at Brgy. Mayao, Lucena City, Quezon and ends at Gumaca, Quezon. The total length of Segment 1 is approximately 61 km. It will include four (4) interchanges (Pagbilao, Atimonan, Aglangan and Gumaca), as well as the toll plazas and operation center that will be necessary for the operation of Segment 1 thereof.
Project Status
As of 05 March 2024:
|
|
Project Description
The Northern Access Link Expressway (“NALEX”) is Component 1 of Greater Capital Region Integrated Expressways Network. It consists of two (2) Phases. NALEX, Phase 1 is a proposed 136.4-kilometer expressway that is envisioned to provide connectivity between the Metro/Mega Manila, the New Manila International Airport (“NMIA”) and Central Luzon as an extension and/or linkage of the Metro Manila Skyway-Stage 3 (“MMSS3”) at Balintawak. NALEX, Phase 2 is a demand-driven expansion from Masantol, Pampanga to Tarlac City.
Project Status
As of 10 March 2023:
|
|
|
|
Project Description
The Project is a 19.37 kms. six (6)-lane, all elevated expressway which will traverse the Pasig River from Radial Road 10 in the City of Manila to its termination at a connection with the proposed South East Metro Manila Expressway at Circumferential Road 6. The Project will connect and utilize a 2.7-km. portion of Skyway Stage 3 from Nagtahan to Plaza Azul.
It consists of 3 Segments:
Segment 1 |
R-10 to Plaza Azul, 5.74 kms |
5.74 kms |
Plaza Azul to San Juan River (MMSS3) |
2.70 kms |
|
Segment 2 | San Juan River to C5 Intersection | 7.325 kms |
Segment 3 | C5 Intersection to C6 Intersection | 6.30 kms |